Load Bank Testing

Load bank testing, based on your operation and its requirements, may be critical to assure your system is prepared to operate as specified and when called upon.  Monthly transfer tests and outages may not meet the minimum required load your generator set needs to help prevent engine slobbering and wet stacking.  Ohio CAT owns and operates over five megawatts of mobile load bank testing equipment.  Our four hour test determines the power capability and condition of your emergency generator along with removing carbon, seating piston rings and removing unburned fuel and oil in the exhaust system.  This test is documented.  We can provide a load test to help you meet NFPA 110 standards.

Contact your nearest Power Systems location for more information: Power Systems Locations